Price | 42.2 |
---|---|
Discounted Amount | $42.20 ($42.20 discount) |
Discounted Amount | Total Discounted Amount KRW (Mobile Purchase Discount KRW ) |
Reward Points | 1% |
Shipping Method | Parcel Service |
Shipping Cost | International Shipping Fee |
Description |
구매방법 | |
---|---|
배송주기 |
Shipping | |
---|---|
Quantity |
|
Product Info | Product | Remove |
---|
Discounted amount of your subtotal will appear when you place your orders.
Checkout
Live-Loaded Packing System with One-Piece Instrumentation Ball Valve. |
Working pressures up to 2,500psig (172bar). |
Temperatures up to -53~148℃ (-65~300°F). |
Stainless steel 316 material. |
is constructed of modified PTFE, reduces potential leak points. |
ON & OFF Type. |
Panel mounting. |
Low operating torque, compact, maximum-flow design. |
does not require system pressure to seal. |
has virtually no dead space. |
As all sizes are for reference, they can be changed without any notification. Please contact us for details or send to online inquiry, we will give you respond as soon as possible. |
(unit:mm)
Pressure-Temperature Ratings |
It is designed to take into account the temperature changes in the outdoor environment where the high temperature process. |
Instrumentation ball valves exposed to dynamic temperature conditions before installation may lose their initial packing load. Packing adjustment may be needed. |
Divide |
1. Loosen the handle set screw using an allen key and remove the handle. |
2. Remove the packing nut & panel nut and set aside for later use. |
3. Place the valve bonnet in the panel hole. |
Reassembly |
4. Tighten the panel nut on to the valve bonnet. keep the panel nut always on the external portion of the panel. |
5. Finger tighten the packing nut on to the valve body. |
6. Place the handle on the stem. Align the set screw with the groove on the side of the stem. Tighten the set screw. |
7. Fully close the valve and retract the stem two or three turns before torque the packing nut to the torque valve below. |
1. Fully insert the tube into the fitting and against the shoulder; rotate the nut finger-tight. |
2. Mark the nut at the 6 o’clock position. |
3. While holding the fitting body steady, tighten the nut one and one-quarter turns to the 9 o’clock position. |
FLUXLOK is brand for Lok fitting of HIFLUX Co., Ltd. |
Suitable for chemical, oil refining, research, oil and gas companies, this product is used for various pressures. |
Has not torque transition for tubing in installation. |
Can be checked and inspected easily during the first installation. |
for the most effective fitting, we recommend you to use HIFLUX Fitting Accessory and Tubing.
There are no posts to show
There are no posts to show